ƒƒƒback
II. Reports and Discussions of the 1st-7th Bayon Symposium,
1996-2002
 
 
”About "The Master Plan for the Conservation & Restoration of the Bayon Complex"

1-5.1: Framework for the Conception of a Master Plan
1-5.2/7.2: Toward Establishment of the Preservation Masterplan of the Bayon
1-7.1: Policy for the Restoration of the Monuments
3-4.1: Brief presentation of the Nara Declaration on Authenticity in the Field of Monumental Conservation
3-6.2: Scheme of the master plan
4-5.2: Presentation of the Draft Masterplan
5-3.1.2: Latest Developments Regarding the Bayon Master Plan Drafting Process 1999-2000
6-3.1.1: Bayon Master Plan : a synthesis of eight years of activities(1994-2001)
7: Masterplan for the Safeguarding of Bayon Temple: Outline of Contents
7: Towards the Bayon Charter: Looking back to the activities of the 1st-6th Bayon Symposium
 
 
”Historical Researches of Bayon

1-6.1: Summary of Architectural History of the Bayon
1-6.2: Excavations at the Bayon
1-6.3: The Bayon and its Epigraphy
1-8.1: On the Original Figure of the Northern Library of the Bayon
3-2.2: Historical Aspects of the Bayon Temple
3-2.3: Architectural Analysis of the Bayon Temple
4-5.3: Notes on the Building Phases of the Faces Towers on the Uppermost Terrace at Bayon
5-3.1.5: Outline of the excavation and investigation at Outer Gallery of the Bayon complex
5-4: Meaning of Bayon Faces
5-5: Safeguarding of Bayon Bas-Reliefs
6-4.1.1.1: Archaeological excavations and investigations in the Bayon complex
6-4.1.1.3: Changes in Religious Practice at the Bayon
 
 
”Restoration Technique Researches of Bayon

1-8.2: Dismantling Work and Technical Survey of the Northern Library of Bayon
2-2.1: Repair Method for Stone Materials by JSA
2-5.1: Preservation and Reconstruction of the Platform-Northern Library of the Bayon
3-5.1: Current State of the Activities Carried Out by JSA at the Bayon Temple: Problems Encountered, Solutions Chosen, Success and Failures
4-5.1: Stability of Main Tower at Bayon and Some Result based upon Monitored Structural Behavior
4-7.2: Notes and Comments on a Visit to Angkor
5-3.1.3: Investigation on Inclination Tendency of Towers in Bayon
5-3.1.4: Maintenance Program
7: Bayon Drainage Investigation
 
 
”Significance of Bayon in the Regional Society of Cambodia

3-4.2: Religious and anthropological aspects of the Bayon Temple
3-4.3: Overall objective of the Bayon Temple restoration : the future function of the temple
4-4.2: Towards a Cultural Conservation of the Bayon
4-4.3: Discussions on the Preservation of the Bayon as a Living Temple
 
 
”Significance of Human Resources Development and Contribution of Experts

4-8: Discussion on Training
 
 
”Understanding Conservation and Restoration Themes to carry on from the Site Visit

3-2.4: Verbatim record of the discussions held during the tour of the Bayon temple conducted by Prof. Claude Jacques and Jacques Dumarçay
5-3.1.1: Visit of Bayon: the Galleries of Bas-Reliefs and the Four Faces Tower
6-4.2: Archaeological Visits
7: Site Visit of Prasat Top West by APSARA and National Research Institute for Cultural Properties Nara
7: Site Visit of Angkor Wat Western Bank by APSARA and Mr. Santoro
7: Site Visit of Angkor Wat Northern Library by JSA
7: Site Visit of Bayon by JSA
7: Site Visit of Bayon relief by JSA and GACP
 
 
”Comparative Researches of the Monuments & Historical Resources in Angkor Area
@(Researches on Monuments)

1-9.1: Maintenance of the Monuments
2-2.2: Repairing Damaged stone Components of Monuments
2-2.3: The Repair and/or Replacement of Sandstone - A Dilemma at the Historic Site of Angkor
2-2.4: Intervention on Sandstone Sculptures at the National Museum of Phnom Penh
2-3.1: Geotechnical Problem of Angkor Monuments in Cambodia
2-3.2: Monitoring and Strengthening of a Monument Damaged by Soil Settlement: the Case of Pre Rup Temple
2-4.1: Report on Various Substructure Consolidation Procedures in Khmer Monuments
2-4.2: Restoration Programme for the Bapuon - Remarks on the Stone Storage Field
2-6.1: Treatment, conservation and maintenance of the sandstone Apsara bas-reliefs at Angkor Wat, Cambodia
3-5.2: Structural problems of Khmer architecture
3-5.3: Angkor Wat - Condition of restoration of the bas-reliefs
4-6.1: The case of Pre Rup Brick Towers
4-6.2: Structural Intervention to Restore Prasat Suor Prat
4-6.3: Central Mass of Bapon Temple
4-6.4: The Conservation and Restoration of the Six Towers at the Preah K Site
4-6.5: Preliminary Analysis of the Causes of Damages to the Central Sanctuary of Chau Say Tevoda
4-6.6: Structural Repair and Consolidation Methods in Preah Khan
4-6.7: Technical Study for the Restoration of the Tower Gates of the Royal Palace
5-6.1: Site Development and Management: a Proposal for Tani Kiln Site
5-6.2: Collaborative Work on Information Management (Documentation) in the Field of Restoration of Monuments
6-5.4.2: Preparatory Research for the Conservation of the Statue in the Southern Wing of the West Gate at Angkor Wat
7: Joint Project with National Research Institute for Cultural Properties Tokyo
 
 
”Comparative Researches of the Monuments & Historical Resources in Angkor Area
@(Researches on Historical Infrastructure)

7: Water and Heritage: Two Key Challenges
 
 
”Comparative Researches of the Monuments & Historical Resources in Angkor Area
@(Researches on Regional Society)

6-5.4.1: The Origin of the Khmer People
7: The survey of Angkor area and regional residents
 
 
”Comparative Researches of the Monuments & Historical Resources in Angkor Area (Management)

4-4.1: Angkor - Issues Involving Conservation and Development of the Site
 
 
”International Case Studies

2-6.2: Photographic Documentation and Photo-monitoring of Cultural Monuments
2-8.1: Deterioration and conservation of natural stone on historic monuments
3-6.1: Case Study: Master Plan for the restoration of Notre Dame de Paris and of Strasbourg cathedral
4-7.1: Towers: The Leaning Tower of Pisa and the Middle age towers in Pavia
4-7.3: Towers and Soil Settlements: the Case of the Tower of Pisa and of the Towers of Angkor
4-7.4: Discussions on the Tower of Pisa
4-7.5: Summary Report on the Restoration Project of the "Palazzo Senatorio on the Campidoglio, Rome
5-7.1: The Trajan Column:
5-7.2: Conservation of Monuments, a Comparative Study: Thailand, Pakistan and Syria
6-5.1: The Coliseum of Rome
6-5.2: Borobudur
6-5.3: Nara
7: Cathedral of Cologne
7: Palace of the Alhambra, Granada-Spain
7: Joya de Cerén, El Salvador
7: Baalbek, Lebanon
 
Legend; (II) 5-4.3:Topic of The 5th Bayon Symposium, Chapter 4.3 on the final report
 
ƒƒƒback